The debris removed + the contaminated old sand will be used to fill part of the left of the 4th hole.
We intend to fill in/reduce in size some of the remaining 25 and also enlarge ones as required. All progress and changes will be logged on this blog......
10th Left |
Hole10_left_A |
Hole10_Left_B |
10th_HoleRight_A |
10th_HoleRight_B |
No comments:
Post a Comment