Saturday, 18 April 2015

Bunker Progress 4th & 17th

4th Hole Left will be reduced in size, 4th Hole Right is now finished, with drainage renewed.
17th left has been slightly reduced, re-shaped and re-sanded.
4th Right Finished

4th Right B

above photo is 4th Hole Right (A)
above 2 photos are 17th hole Left

No comments:

Post a Comment